Painted walls in a home built before 1978
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Serving Schaumburg & nearby Roselle, Hoffman Estates
Cracked plaster, bulky soffits and patched ceilings in Schaumburg kitchens, finished smooth and ready for paint.
We handle the surfaces around the cabinets: walls, ceilings, soffits and trim. In Schaumburg that can mean patching plaster in an older house, taking down a soffit before new cabinets go in, or matching a ceiling texture after a plumbing repair.
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Kitchens from the 1970s often have soffits or a dropped ceiling with a light box. Removing them gives a taller, brighter room.
Leaks from the unit above are common in condo buildings. We repair the ceiling after the association and the neighbor fix the source.
Many soffits are empty; some hide ducts, vent pipes or wiring. We check before demolition and plan around what we find.
Remodels leave walls full of patches waiting to happen. We repair every opening so the new kitchen starts with clean walls.
We drive new screws next to popped nails and retape seams that have cracked or bubbled.
Soft, bubbling paint behind the sink usually means the drywall is wet. We fix the source with you, then replace the bad section.
When a soffit carries a duct or a plumbing vent, it can sometimes be rerouted, made smaller or built into the new cabinet design.
Before
AfterA 1980s two-story in Schaumburg, a typical kitchen for Schaumburg. What we started with: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. The reason for the call: bulky soffits and a cracked ceiling. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant inspection and moisture check, taping and finishing, plus skim coat and texture.
Before
AfterA raised ranch in Roselle, a typical kitchen for Roselle. The kitchen as it was: medium-brown stained oak cabinets with wide frames and a hanging swag lamp. The reason for the call: bulky soffits and a cracked ceiling. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included protection and dust control, skim coat and texture, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Roselle →
Before
AfterThe site: a two-story colonial from the 1990s near Nordic Park. The kitchen as it was: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. The reason for the call: a cracked ceiling and dated lighting box. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered inspection and moisture check, skim coat and texture, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Itasca →
Before
AfterWhat changed: a new layout with an island, cabinets in light warm taupe, warm walnut butcher block counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Schaumburg →
Before
AfterA lowered charcoal concrete-look quartz counter section with knee space under the sink, cabinets in deep burgundy with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and a flush drum fixture and under-cabinet lights.
Accessible Kitchen Remodeling in Schaumburg →WeathersfieldInternational VillageWoodfield areaOlde Schaumburg CentreTown Square
ZIP 60193ZIP 60173ZIP 60194ZIP 60195
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.