Painted walls in a home built before 1978
Sanding or cutting painted walls in a pre-1978 home can release lead dust. We follow EPA lead-safe work practices: containment, careful prep and HEPA cleanup.
Serving Roselle & nearby Bloomingdale, Hanover Park
Cracked plaster, bulky soffits and patched ceilings in Roselle kitchens, finished smooth and ready for paint.
Kitchens take more wall damage than any other room: leaks under the sink and from the bathroom above, holes left by old cabinets and outlets, and soffits nobody wants anymore. We repair drywall and plaster in Roselle kitchens, remove soffits, patch ceilings and finish everything so it disappears under paint.
Sanding or cutting painted walls in a pre-1978 home can release lead dust. We follow EPA lead-safe work practices: containment, careful prep and HEPA cleanup.
Fluorescent light boxes and boxed soffits were common in that era. We remove them and finish a flat ceiling ready for new lights.
Hairline cracks at corners and seams come back if they are only caulked. We open them, tape and refinish so they stay closed.
Ceilings that sag after a leak need new drywall, not just paint. We replace the affected section and blend it into the rest.
When a soffit carries a duct or a plumbing vent, it can sometimes be rerouted, made smaller or built into the new cabinet design.
Popcorn texture traps grease and dust. We scrape it and finish the ceiling smooth; in older homes the texture should be tested for asbestos first.
We drive new screws next to popped nails and retape seams that have cracked or bubbled.
Gaps between cabinets and ceiling or worn door casing make a kitchen look unfinished. New trim fixes both.
Before
AfterA 1970s tract home in Roselle, a typical kitchen for Roselle. The kitchen as it was: medium-brown stained oak cabinets with wide frames and a hanging swag lamp. The reason for the call: a kitchen ceiling patched too many times. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant inspection and moisture check, taping and finishing, plus primer and paint-ready finish.
Before
AfterThe site: a two-story colonial from the 1990s near Old Town Bloomingdale. Before: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. The reason for the call: a dropped ceiling and an old light box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant protection and dust control, soffit and damaged board removal, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Bloomingdale →
Before
AfterA 1980s two-story near Town Square, a typical kitchen for Schaumburg. What we started with: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. The main complaint was soffits that made the room feel low. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant protection and dust control, crown, casing and trim, plus cleanup.
Kitchen Drywall & Finish Work in Schaumburg →
Before
AfterWhat changed: a new layout with an island, cabinets in terracotta, dark soapstone-look quartz counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Roselle →
Before
AfterFinished: a lowered bright white quartz counter section with knee space under the sink, cabinets in cream uppers and walnut-stained lowers with matte black pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and recessed lights and under-cabinet LED strips.
Accessible Kitchen Remodeling in Roselle →ZIP 60172
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.