A 1960s kitchen on a slab or crawlspace
Whether your 1960s house has a basement, crawlspace or slab decides how we build the new foundation and run pipes into it.
Serving Lombard & nearby Villa Park, Glen Ellyn
Bump-outs and rear additions that give your Lombard kitchen the room it's missing, from zoning check to finished cabinets.
If you have already tried every layout on paper and the room is still too small, an addition may be the answer. We check what your Lombard lot and zoning allow, design the new space with the kitchen, and build both as one project.
Whether your 1960s house has a basement, crawlspace or slab decides how we build the new foundation and run pipes into it.
If you eat standing at the counter because there's no space for chairs, adding floor area is the honest fix, and a bump-out is often enough.
We plan dining space into the addition so the table sits next to the cooking, not across the house.
An addition is a bigger project than a remodel. We compare both options on your floor plan so the decision is clear.
Food stacked on counters and in the basement means the kitchen is short of storage. An addition can hold a walk-in or a wall of pantry cabinets.
Adding space lets us add daylight too, with windows on two sides of the new section or a patio door that opens the kitchen to the backyard.
From the yard, a good addition looks like it was always there. That means matched materials, aligned trim and a clean roof tie-in.
Adding a few feet at the back entry gives the family a landing spot for gear and leaves the kitchen for cooking.
Before
In progress
AfterThe site: a 1950s ranch in Lombard. What we started with: 1970s dark pecan-stained cabinets, light beige laminate and a dome ceiling light. What bothered the owners most: no space to eat together and too little daylight. The result: the kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in pale mint green with matte black pulls, black honed granite counters, hickory luxury vinyl plank flooring through the old and new space and two glass pendants and recessed lights. On site this meant feasibility and zoning check, design and permit drawings, plus framing and roof tie-in.
Before
AfterA 1950s ranch in Villa Park, a typical kitchen for Villa Park. Before: original birch cabinets painted white decades ago, sagging doors, chrome pulls, laminate with an aluminum edge band and a round fluorescent ceiling ring. The main complaint was a small, dark kitchen with no room for a table. The result: the kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in deep olive with polished nickel pulls, warm walnut butcher block counters, light oak hardwood flooring through the old and new space and two glass pendants and recessed lights. The job covered feasibility and zoning check, plumbing, electrical and HVAC, plus insulation and drywall.
Kitchen Additions in Villa Park →
Before
AfterFinished: a new layout with an island, cabinets in two-tone, white quartz counters and black cage pendants and slim recessed lights.
Kitchen Design & Layout Planning in Lombard →
Before
AfterWhat changed: a lowered black honed granite counter section with knee space under the sink, cabinets in deep burgundy with polished nickel pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and black cage pendants and slim recessed lights.
Accessible Kitchen Remodeling in Lombard →
Before
AfterFinished: the wall removed and a flush beam in the ceiling, the kitchen open to the next room, cabinets in light warm taupe with polished nickel pulls, bright white quartz counters, black-and-white checkerboard tile flooring through both rooms and a flush drum fixture and under-cabinet lights.
Kitchen Wall Removal & Structural Assessment in Lombard →ZIP 60148
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen Wall Removal & Structural AssessmentOpen the kitchen up with an engineered beam.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.