Single-family homes with yard to spare
If your lot has room behind the house, a rear kitchen addition with a family room or mudroom can solve several problems at once.
Serving Hoffman Estates & nearby Schaumburg, Hanover Park
Bump-outs and rear additions that give your Hoffman Estates kitchen the room it's missing, from zoning check to finished cabinets.
Sometimes no layout can fix a kitchen that is simply too small. A kitchen addition in Hoffman Estates — a bump-out of a few feet or a full rear addition — adds floor space for an island, a table or a pantry, and we handle it from the zoning check and permit drawings to the foundation, roof and finished cabinets.
If your lot has room behind the house, a rear kitchen addition with a family room or mudroom can solve several problems at once.
We match the new foundation to the old one, whether a basement wall, crawlspace or slab, so floors line up and plumbing can reach.
If the side door dumps everyone into the kitchen, the new space can include a small entry with storage, keeping boots and bags out of the work zone.
A bigger kitchen often means more circuits: an extra oven, a second dishwasher, island outlets and more lighting. We check the panel and upgrade service if needed.
Most of an addition is built outside the existing wall, so the old kitchen can often stay in use until we open the wall near the end.
Households where two people cook at once often want a prep sink or a second oven, and there's no wall left for them. The new square footage makes room.
When the room is too narrow for an island and too tight for a table, rearranging won't help. A bump-out of several feet can make room for both.
New square footage needs heat and air. We extend ductwork from the existing system when it has capacity, or add a separate unit when it doesn't.
Before
In progress
AfterThis one is a 1970s split-level in Hoffman Estates. Before: dark stained oak cabinets with wide face frames and a scalloped wood valance over the sink, harvest-gold laminate and a large fluorescent light box. The main complaint was no space to eat together and too little daylight. The result: the kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in pale mint green with matte black pulls, creamy quartzite-look quartz counters, large-format light stone-look porcelain tile flooring through the old and new space and a flush drum fixture and under-cabinet lights. The job covered excavation and foundation, grading, gutters and drainage, plus opening the existing wall.
Before
AfterThe site: a 1990s two-story colonial near Town Square. The kitchen as it was: white thermofoil cabinets peeling at the edges, oak trim, white ceramic tile with dark stained grout lines and a brass chandelier over the nook. The reason for the call: a kitchen that had run out of space. After: the kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in deep olive with polished nickel pulls, warm walnut butcher block counters, black-and-white checkerboard tile flooring through the old and new space and recessed lights and under-cabinet LED strips. The job covered permits and plan review, excavation and foundation, plus insulation and drywall.
Kitchen Additions in Schaumburg →
Before
AfterThis one is a 1980s two-story in Palatine. The kitchen as it was: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs, almond laminate with a backsplash lip and a fluorescent box light in the ceiling. The reason for the call: a cramped kitchen with one small window. Finished kitchen: the kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in light sand beige with unlacquered brass knobs and cup pulls, warm walnut butcher block counters, light oak luxury vinyl plank flooring through the old and new space and black cage pendants and slim recessed lights. On site this meant excavation and foundation, windows, doors and exterior finish, plus insulation and drywall.
Kitchen Additions in Palatine →
Before
AfterWhat changed: a new layout with an island, cabinets in terracotta, dark soapstone-look quartz counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Hoffman Estates →
Before
AfterA lowered bright white quartz counter section with knee space under the sink, cabinets in cream uppers and walnut-stained lowers with matte black pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and recessed lights and under-cabinet LED strips.
Accessible Kitchen Remodeling in Hoffman Estates →ZIP 60192ZIP 60169ZIP 60120ZIP 60010
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen Wall Removal & Structural AssessmentOpen the kitchen up with an engineered beam.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.