Painted walls in a home built before 1978
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Serving Elk Grove Village & nearby Itasca, Wood Dale
Cracked plaster, bulky soffits and patched ceilings in Elk Grove Village kitchens, finished smooth and ready for paint.
Kitchens take more wall damage than any other room: leaks under the sink and from the bathroom above, holes left by old cabinets and outlets, and soffits nobody wants anymore. We repair drywall and plaster in Elk Grove Village kitchens, remove soffits, patch ceilings and finish everything so it disappears under paint.
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Dropped kitchen ceilings from the 1970s can usually be removed. We check what is above and patch the original ceiling.
A duct inside the soffit does not always end the plan. We look at rerouting, shrinking the box or hiding it above the uppers.
If a past patch was left smooth, we can retexture it, or skim the whole ceiling smooth if you prefer.
Many soffits are empty; some hide ducts, vent pipes or wiring. We check before demolition and plan around what we find.
When cabinets, a range hood or a light fixture move, they leave holes and torn paper behind. We cut out the damage, patch and finish it flat.
A brown ring or a soft spot in the kitchen ceiling usually means a leak from above. Once the leak is fixed, we cut out wet board, replace it and finish it to match.
Popcorn texture traps grease and dust. We scrape it and finish the ceiling smooth; in older homes the texture should be tested for asbestos first.
Before
AfterThis one is a 1960s ranch in Elk Grove Village. The kitchen as it was: original birch cabinets painted white decades ago, sagging doors, chrome pulls and a round fluorescent ceiling ring. What bothered the owners most: a dropped ceiling and an old light box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant skim coat and texture, crown, casing and trim, plus cleanup.
Before
AfterThe site: a 1980s two-story near Itasca Historical District. What we started with: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. What bothered the owners most: a cracked ceiling and dated lighting box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included soffit and damaged board removal, skim coat and texture, plus crown, casing and trim.
Kitchen Drywall & Finish Work in Itasca →
Before
AfterThe site: a 1960s ranch in Wood Dale. The kitchen as it was: 1970s dark pecan-stained cabinets and a dome ceiling light. What bothered the owners most: a cracked ceiling and dated lighting box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included framing and backing, new drywall, plus cleanup.
Kitchen Drywall & Finish Work in Wood Dale →
Before
AfterA new layout with an island, cabinets in light greige uppers and muted blue lowers, black honed granite counters and two glass pendants and recessed lights.
Kitchen Design & Layout Planning in Elk Grove Village →
Before
AfterFinished: a lowered charcoal concrete-look quartz counter section with knee space under the sink, cabinets in pale sage uppers and light gray lowers with satin brass pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and a flush drum fixture and under-cabinet lights.
Accessible Kitchen Remodeling in Elk Grove Village →ZIP 60007
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.