1990s soffits and dropped ceilings
Fluorescent light boxes and boxed soffits were common in that era. We remove them and finish a flat ceiling ready for new lights.
Serving Crystal Lake & nearby Lake Zurich, Elgin
Cracked plaster, bulky soffits and patched ceilings in Crystal Lake kitchens, finished smooth and ready for paint.
We handle the surfaces around the cabinets: walls, ceilings, soffits and trim. In Crystal Lake that can mean patching plaster in an older house, taking down a soffit before new cabinets go in, or matching a ceiling texture after a plumbing repair.
Fluorescent light boxes and boxed soffits were common in that era. We remove them and finish a flat ceiling ready for new lights.
Taking off a backsplash often tears the wall face. We repair the paper, skim it smooth and prime it for paint or new tile.
Recurring cracks often follow drywall seams or door corners. Taping the joint properly is what keeps them from returning.
Soft, bubbling paint behind the sink usually means the drywall is wet. We fix the source with you, then replace the bad section.
Old anchor holes, moved outlets and a gap where the hood used to be all need patching before paint. We fill them so they cannot be seen.
We remove popcorn ceilings and skim them smooth, after testing when the age of the home calls for it.
Gaps between cabinets and ceiling or worn door casing make a kitchen look unfinished. New trim fixes both.
If a past patch was left smooth, we can retexture it, or skim the whole ceiling smooth if you prefer.
Before
AfterA two-story colonial from the 1990s near Downtown, a typical kitchen for Crystal Lake. Before: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. What bothered the owners most: a cracked ceiling and dated lighting box. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included protection and dust control, crown, casing and trim, plus primer and paint-ready finish.
Before
AfterA 1990s two-story colonial in Lake Zurich, a typical kitchen for Lake Zurich. The kitchen as it was: golden-oak cabinets with oak soffits above and two hanging glass pendants. The main complaint was soffits that limited how tall the cabinets could be. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included protection and dust control, primer and paint-ready finish, plus cleanup.
Kitchen Drywall & Finish Work in Lake Zurich →
Before
AfterThis one is a 1990s two-story colonial near Gifford Park. Before: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. The main complaint was bulky soffits and a cracked ceiling. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered plaster repair, skim coat and texture, plus crown, casing and trim.
Kitchen Drywall & Finish Work in Elgin →
Before
AfterWhat changed: a new layout with an island, cabinets in white uppers and dusty blue lowers, warm walnut butcher block counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Crystal Lake →
Before
AfterA lowered charcoal concrete-look quartz counter section with knee space under the sink, cabinets in light greige with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and a flush drum fixture and under-cabinet lights.
Accessible Kitchen Remodeling in Crystal Lake →DowntownCoventryFour ColoniesThe VillagesWedgewoodBurtons Bridge
ZIP 60014ZIP 60012ZIP 60098
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.