Painted walls in a home built before 1978
Sanding or cutting painted walls in a pre-1978 home can release lead dust. We follow EPA lead-safe work practices: containment, careful prep and HEPA cleanup.
Serving Palatine & nearby Arlington Heights, Buffalo Grove
Cracked plaster, bulky soffits and patched ceilings in Palatine kitchens, finished smooth and ready for paint.
We handle the surfaces around the cabinets: walls, ceilings, soffits and trim. In Palatine that can mean patching plaster in an older house, taking down a soffit before new cabinets go in, or matching a ceiling texture after a plumbing repair.
Sanding or cutting painted walls in a pre-1978 home can release lead dust. We follow EPA lead-safe work practices: containment, careful prep and HEPA cleanup.
Fluorescent light boxes and boxed soffits were common in that era. We remove them and finish a flat ceiling ready for new lights.
Leaks from the unit above are common in condo buildings. We repair the ceiling after the association and the neighbor fix the source.
Walls exposed behind old cabinets are rarely ready for paint. We level them and fill every gap before the finish goes on.
When cabinets, a range hood or a light fixture move, they leave holes and torn paper behind. We cut out the damage, patch and finish it flat.
Crown molding at the ceiling, new casing around doorways and a clean baseboard finish a kitchen. We install and caulk trim ready for paint.
We drive new screws next to popped nails and retape seams that have cracked or bubbled.
We repair cracked drywall and plaster with tape and compound, not just filler, so the fix lasts through seasons.
Before
AfterA two-story colonial from the 1990s in Palatine, a typical kitchen for Palatine. The kitchen as it was: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. What bothered the owners most: a cracked ceiling and dated lighting box. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered taping and finishing, primer and paint-ready finish, plus cleanup.
Before
AfterThe site: a 1950s ranch in Arlington Heights. The kitchen as it was: dark walnut-stained flush-panel cabinets with brass pulls and a fluorescent box light. What bothered the owners most: a cracked ceiling and dated lighting box. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant plaster repair, taping and finishing, plus crown, casing and trim.
Kitchen Drywall & Finish Work in Arlington Heights →
Before
AfterThe site: a two-story colonial from the 1990s in Lake Zurich. Before: golden-oak cabinets with oak soffits above and two hanging glass pendants. What bothered the owners most: soffits that limited how tall the cabinets could be. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included taping and finishing, crown, casing and trim, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Lake Zurich →
Before
AfterWhat changed: a new layout with an island, cabinets in terracotta, charcoal concrete-look quartz counters and a flush drum fixture and under-cabinet lights.
Kitchen Design & Layout Planning in Palatine →
Before
AfterWhat changed: a lowered warm walnut butcher block counter section with knee space under the sink, cabinets in pale mint green with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and two glass pendants and recessed lights.
Accessible Kitchen Remodeling in Palatine →ZIP 60067ZIP 60074
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.