Plaster walls in an older Berwyn home
We repair plaster rather than tearing it out when it is still sound, using plaster washers, bonding agents and setting compound.
Serving Berwyn & nearby Oak Park, Chicago
Cracked plaster, bulky soffits and patched ceilings in Berwyn kitchens, finished smooth and ready for paint.
Kitchens take more wall damage than any other room: leaks under the sink and from the bathroom above, holes left by old cabinets and outlets, and soffits nobody wants anymore. We repair drywall and plaster in Berwyn kitchens, remove soffits, patch ceilings and finish everything so it disappears under paint.
We repair plaster rather than tearing it out when it is still sound, using plaster washers, bonding agents and setting compound.
Sanding or cutting painted walls in a pre-1978 home can release lead dust. We follow EPA lead-safe work practices: containment, careful prep and HEPA cleanup.
Crown molding at the ceiling, new casing around doorways and a clean baseboard finish a kitchen. We install and caulk trim ready for paint.
When cabinets, a range hood or a light fixture move, they leave holes and torn paper behind. We cut out the damage, patch and finish it flat.
If a past patch was left smooth, we can retexture it, or skim the whole ceiling smooth if you prefer.
Ceilings that sag after a leak need new drywall, not just paint. We replace the affected section and blend it into the rest.
Soft, bubbling paint behind the sink usually means the drywall is wet. We fix the source with you, then replace the bad section.
If what is inside cannot move, we rebuild a smaller, cleaner soffit or box it to line up with the cabinets.
Before
AfterThis one is a prewar brick bungalow near LaVergne. What we started with: dark stained 1970s oak cabinets with heavy frames and a single pendant bowl light. The reason for the call: a kitchen ceiling patched too many times. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included protection and dust control, new drywall, plus cleanup.
Before
AfterThe site: a 1970s tract home in Oak Brook. Before: medium-brown stained oak cabinets with wide frames and a hanging swag lamp. The main complaint was soffits that made the room feel low. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered protection and dust control, soffit and damaged board removal, plus framing and backing.
Kitchen Drywall & Finish Work in Oak Brook →
Before
AfterA postwar bi-level in Elmhurst, a typical kitchen for Elmhurst. Before: original birch cabinets painted white decades ago, sagging doors, chrome pulls and a round fluorescent ceiling ring. The reason for the call: a cracked ceiling and dated lighting box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered protection and dust control, framing and backing, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Elmhurst →
Before
AfterWhat changed: a new layout with an island, cabinets in light greige uppers and muted blue lowers, creamy quartzite-look quartz counters and two glass pendants and recessed lights.
Kitchen Design & Layout Planning in Berwyn →
Before
AfterWhat changed: a lowered dark soapstone-look quartz counter section with knee space under the sink, cabinets in cream uppers and walnut-stained lowers with satin brass pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and two glass pendants and recessed lights.
Accessible Kitchen Remodeling in Berwyn →South BerwynSouth Oak Park areaDepot DistrictLaVergneOgden Avenue
ZIP 60402
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.