Uneven or out-of-level floor
A floor that rolls under a straightedge needs flattening before new flooring. We choose between leveling the framing and leveling the surface.
Serving Park Ridge & nearby Des Plaines, Glenview
Soft, rotted or squeaky kitchen subfloors opened up, rebuilt and made solid in Park Ridge homes.
Kitchens are where leaks hide: under the dishwasher, behind the fridge water line and below the sink base. Our Park Ridge carpenters open the floor, trace the moisture to its source, replace what is damaged and reinforce framing where it needs it.
A floor that rolls under a straightedge needs flattening before new flooring. We choose between leveling the framing and leveling the surface.
Old subfloor repairs are often the weak spot. We rebuild them so the edges are fully backed.
Years of small leaks under a sink can rot the subfloor while the cabinet bottom hides it. We look underneath before deciding how far the repair goes.
Tile that cracks and click-lock floors that gap at the seams are often reacting to a subfloor that flexes or isn't flat. We fix the base so the finish floor stops failing.
A floor that flexes when someone walks through may have undersized, damaged or notched joists. We check the framing and may sister new lumber alongside.
From below in a basement, or from above with the flooring off, we find where the floor moves and stop it.
Tile needs a stiffer base than vinyl. We add a layer of plywood or reinforce the framing before a tile floor goes in.
Raised lines in a floor that follow a grid usually trace swollen subfloor seams. We replace the damaged panels.
Problem
Fixed
DetailThe site: a two-story colonial from the 1990s in Park Ridge. What we started with: beige sheet vinyl and almond appliances. What bothered the owners most: a soft spot that had opened under the vinyl. Finished kitchen: new plywood subfloor glued and screwed down in front of the dishwasher, ready for flooring. On site this meant removing the finish floor, moisture testing, plus cutting out damaged subfloor.
Before
AfterA 1990s two-story colonial in Des Plaines, a typical kitchen for Des Plaines. The kitchen as it was: 12-inch beige ceramic tile and black appliances. What bothered the owners most: tiles cracking over a floor that flexed. After: new plywood subfloor glued and screwed down in front of the dishwasher, ready for flooring. The job covered removing the finish floor, leveling and flattening, plus ready for flooring.
Kitchen Subfloor Repair in Des Plaines →
Before
AfterThis one is a 1980s two-story in Mount Prospect. What we started with: oak parquet and white appliances. The main complaint was a bouncy floor near the dishwasher. The result: new plywood subfloor glued and screwed down in front of the dishwasher, ready for flooring. The job covered removing the finish floor, joist inspection and reinforcement, plus leveling and flattening.
Kitchen Subfloor Repair in Mount Prospect →
Before
AfterFinished: the oak floor sanded and refinished with a satin clear finish, grain visible and the water marks gone.
Hardwood Floor Repair & Refinishing in Park Ridge →
Before
AfterWhat changed: cabinets in forest green with matte black pulls, black honed granite counters, a green zellige-look tile backsplash, warm oak luxury vinyl plank flooring and a flush drum fixture and under-cabinet lights.
Kitchen Remodeling in Park Ridge →ZIP 60068
Hardwood Floor Repair & RefinishingSanding, refinishing and board repairs for kitchen hardwood floors.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Cabinet RefacingNew doors and fronts on your existing cabinet boxes.
Countertop Fabrication & InstallationQuartz, granite and butcher block, templated and installed.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.