Painted walls in a home built before 1978
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Serving Park Ridge & nearby Des Plaines, Glenview
Cracked plaster, bulky soffits and patched ceilings in Park Ridge kitchens, finished smooth and ready for paint.
After a leak, a remodel or years of wear, kitchen walls and ceilings need a careful finisher. We patch, tape, skim and texture so repairs in your Park Ridge kitchen blend in, and we add crown molding or trim where it finishes the room.
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Kitchens from the 1950s often have soffits or a dropped ceiling with a light box. Removing them gives a taller, brighter room.
Crown molding at the ceiling, new casing around doorways and a clean baseboard finish a kitchen. We install and caulk trim ready for paint.
Stains bleed through regular paint. We remove damaged material, patch with new board, seal the area and refinish the ceiling.
We cut out water-damaged wall behind the sink, let the cavity dry and close it up with new board.
Old anchor holes, moved outlets and a gap where the hood used to be all need patching before paint. We fill them so they cannot be seen.
We drive new screws next to popped nails and retape seams that have cracked or bubbled.
We repair cracked drywall and plaster with tape and compound, not just filler, so the fix lasts through seasons.
Before
AfterThe site: a postwar bi-level in Park Ridge. The kitchen as it was: dark walnut-stained flush-panel cabinets with brass pulls and a fluorescent box light. The main complaint was a dropped ceiling and an old light box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant protection and dust control, soffit and damaged board removal, plus taping and finishing.
Before
AfterThe site: a 1960s ranch in Skokie. Before: original birch cabinets painted white decades ago, sagging doors, chrome pulls and a round fluorescent ceiling ring. The main complaint was a cracked ceiling and dated lighting box. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included soffit and damaged board removal, taping and finishing, plus primer and paint-ready finish.
Kitchen Drywall & Finish Work in Skokie →
Before
AfterA new layout with an island, cabinets in two-tone, white quartz counters and black cage pendants and slim recessed lights.
Kitchen Design & Layout Planning in Park Ridge →
Before
AfterWhat changed: a lowered black honed granite counter section with knee space under the sink, cabinets in deep burgundy with polished nickel pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and black cage pendants and slim recessed lights.
Accessible Kitchen Remodeling in Park Ridge →
Before
AfterThe kitchen extended by a 10-ft bump-out with a row of new windows and a dining area, cabinets in deep olive with polished nickel pulls, warm walnut butcher block counters, light oak hardwood flooring through the old and new space and two glass pendants and recessed lights.
Kitchen Additions in Park Ridge →ZIP 60068
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.