1990s soffits and dropped ceilings
Dropped kitchen ceilings from the 1990s can usually be removed. We check what is above and patch the original ceiling.
Serving Geneva & nearby Batavia, St. Charles
Cracked plaster, bulky soffits and patched ceilings in Geneva kitchens, finished smooth and ready for paint.
After a leak, a remodel or years of wear, kitchen walls and ceilings need a careful finisher. We patch, tape, skim and texture so repairs in your Geneva kitchen blend in, and we add crown molding or trim where it finishes the room.
Dropped kitchen ceilings from the 1990s can usually be removed. We check what is above and patch the original ceiling.
A brown ring or a soft spot in the kitchen ceiling usually means a leak from above. Once the leak is fixed, we cut out wet board, replace it and finish it to match.
When a soffit carries a duct or a plumbing vent, it can sometimes be rerouted, made smaller or built into the new cabinet design.
Crown molding at the ceiling, new casing around doorways and a clean baseboard finish a kitchen. We install and caulk trim ready for paint.
When cabinets, a range hood or a light fixture move, they leave holes and torn paper behind. We cut out the damage, patch and finish it flat.
We repair cracked drywall and plaster with tape and compound, not just filler, so the fix lasts through seasons.
Soft, bubbling paint behind the sink usually means the drywall is wet. We fix the source with you, then replace the bad section.
Walls exposed behind old cabinets are rarely ready for paint. We level them and fill every gap before the finish goes on.
Before
AfterThe site: a 1990s two-story colonial near Mill Creek. Before: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. What bothered the owners most: a kitchen ceiling patched too many times. After: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant protection and dust control, framing and backing, plus new drywall.
Before
AfterA two-story colonial from the 1990s in St. Charles, a typical kitchen for St. Charles. Before: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. The reason for the call: a cracked ceiling and dated lighting box. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant protection and dust control, framing and backing, plus plaster repair.
Kitchen Drywall & Finish Work in St. Charles →
Before
AfterA 1990s two-story colonial in West Chicago, a typical kitchen for West Chicago. What we started with: golden-oak cabinets with oak soffits above and two hanging glass pendants. What bothered the owners most: soffits that limited how tall the cabinets could be. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered inspection and moisture check, protection and dust control, plus framing and backing.
Kitchen Drywall & Finish Work in West Chicago →
Before
AfterFinished: a new layout with an island, cabinets in light warm taupe, warm walnut butcher block counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Geneva →
Before
AfterWhat changed: a lowered warm walnut butcher block counter section with knee space under the sink, cabinets in pale mint green with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and two glass pendants and recessed lights.
Accessible Kitchen Remodeling in Geneva →Mill Creek
ZIP 60134ZIP 60510
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.