1990s soffits and dropped ceilings
Kitchens from the 1990s often have soffits or a dropped ceiling with a light box. Removing them gives a taller, brighter room.
Serving Aurora & nearby Batavia, Warrenville
Cracked plaster, bulky soffits and patched ceilings in Aurora kitchens, finished smooth and ready for paint.
Kitchens take more wall damage than any other room: leaks under the sink and from the bathroom above, holes left by old cabinets and outlets, and soffits nobody wants anymore. We repair drywall and plaster in Aurora kitchens, remove soffits, patch ceilings and finish everything so it disappears under paint.
Kitchens from the 1990s often have soffits or a dropped ceiling with a light box. Removing them gives a taller, brighter room.
Boxed soffits over the uppers make a kitchen feel low and limit cabinet height. We open them, deal with what is inside and finish the ceiling flat.
We level and prime walls for paint, or check flatness and backing before tile goes up.
Stains bleed through regular paint. We remove damaged material, patch with new board, seal the area and refinish the ceiling.
We add crown molding and replace damaged casing and baseboard so the edges of the room look sharp.
Taking off a backsplash often tears the wall face. We repair the paper, skim it smooth and prime it for paint or new tile.
If what is inside cannot move, we rebuild a smaller, cleaner soffit or box it to line up with the cabinets.
A smooth patch on a textured ceiling stands out. We match orange peel, knockdown or other textures so the repair blends.
Before
AfterThis one is a two-story colonial from the 1990s near West Side. Before: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. The main complaint was a dropped ceiling and an old light box. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant new drywall, skim coat and texture, plus cleanup.
Before
AfterA two-story colonial from the 1990s in Batavia, a typical kitchen for Batavia. The kitchen as it was: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. What bothered the owners most: bulky soffits and a cracked ceiling. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. On site this meant inspection and moisture check, new drywall, plus plaster repair.
Kitchen Drywall & Finish Work in Batavia →
Before
AfterThis one is a two-story colonial from the 1990s near Highlands. The kitchen as it was: golden-oak cabinets with oak soffits above and two hanging glass pendants. What bothered the owners most: soffits that limited how tall the cabinets could be. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included new drywall, skim coat and texture, plus crown, casing and trim.
Kitchen Drywall & Finish Work in Naperville →
Before
AfterWhat changed: a new layout with an island, cabinets in white uppers and dusty blue lowers, warm walnut butcher block counters and recessed lights and under-cabinet LED strips.
Kitchen Design & Layout Planning in Aurora →
Before
AfterWhat changed: a lowered charcoal concrete-look quartz counter section with knee space under the sink, cabinets in deep burgundy with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and a flush drum fixture and under-cabinet lights.
Accessible Kitchen Remodeling in Aurora →Near EastsideTannerRiddle HighlandsPalace StreetWest SideFar East Side
ZIP 60506ZIP 60502ZIP 60505ZIP 60504ZIP 60503
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.