Painted trim in a home built before 1978
Removing a window in a pre-1978 home disturbs painted trim that may contain lead. We follow EPA lead-safe work practices: containment, careful removal and HEPA cleanup.
Serving Arlington Heights & nearby Mount Prospect, Palatine
A new window over the sink in your Arlington Heights kitchen that opens easily, seals tight and fits the trim around it.
The window over the sink is the one you look through and reach for every day, and in many Arlington Heights kitchens it is also the oldest and hardest to open. We replace kitchen windows, in the same opening or a larger one, and finish the trim inside and out.
Removing a window in a pre-1978 home disturbs painted trim that may contain lead. We follow EPA lead-safe work practices: containment, careful removal and HEPA cleanup.
Condo window replacements often need association approval for the exterior look. We help gather what they ask for.
A tighter, double-pane window and a sealed installation make a kitchen quieter.
New windows need clean interior trim. We install casing and a stool or a tiled return, ready for paint.
A larger window is a bigger job than a same-size swap: framing, exterior finish and interior trim all change. We plan it all together.
If you want a box window for herbs over the sink, we can replace a flat window with a garden unit.
Water running down the glass in winter often means cold glass. A modern insulated window and good ventilation reduce it.
Single-pane glass and bare aluminum frames are the least efficient windows in a house. Replacing the kitchen one is a good start.
Before
AfterThe site: a postwar Cape Cod in Arlington Heights. What we started with: stainless double sink. What bothered the owners most: a drafty window that was hard to open over the sink. The result: a new larger double-hung window over the sink with clean white trim. On site this meant opening repair or reframing, exterior trim and capping, plus interior trim and stool.
Before
AfterA 1950s ranch in Mount Prospect, a typical kitchen for Mount Prospect. The kitchen as it was: stainless double sink. What bothered the owners most: fogged glass and peeling paint on the window over the sink. After: a new larger double-hung window over the sink with clean white trim. Work included removing the old window, opening repair or reframing, plus check and cleanup.
Kitchen Window Replacement in Mount Prospect →
Before
AfterThe site: a 1990s two-story colonial in Palatine. The kitchen as it was: solid-surface integrated sink. The reason for the call: fogged glass and peeling paint on the window over the sink. After: a new larger double-hung window over the sink with clean white trim. The job covered permits and approvals, setting and insulating the window, plus exterior trim and capping.
Kitchen Window Replacement in Palatine →
Before
AfterA new layout with an island, cabinets in light greige uppers and muted blue lowers, black honed granite counters and two glass pendants and recessed lights.
Kitchen Design & Layout Planning in Arlington Heights →
Before
AfterWhat changed: a lowered black honed granite counter section with knee space under the sink, cabinets in deep burgundy with polished nickel pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and black cage pendants and slim recessed lights.
Accessible Kitchen Remodeling in Arlington Heights →ZIP 60004ZIP 60005
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.