Painted trim in a home built before 1978
Removing a window in a pre-1978 home disturbs painted trim that may contain lead. We follow EPA lead-safe work practices: containment, careful removal and HEPA cleanup.
Serving Villa Park & nearby Elmhurst, Lombard
A new window over the sink in your Villa Park kitchen that opens easily, seals tight and fits the trim around it.
The window over the sink is the one you look through and reach for every day, and in many Villa Park kitchens it is also the oldest and hardest to open. We replace kitchen windows, in the same opening or a larger one, and finish the trim inside and out.
Removing a window in a pre-1978 home disturbs painted trim that may contain lead. We follow EPA lead-safe work practices: containment, careful removal and HEPA cleanup.
If the casing is cracked or swollen, we replace it as part of the window job.
Water running down the glass in winter often means cold glass. A modern insulated window and good ventilation reduce it.
A garden window pushes out from the wall and gives plants and light more room over the sink. We install it in a properly sized and flashed opening.
Single-pane glass and bare aluminum frames are the least efficient windows in a house. Replacing the kitchen one is a good start.
Drafty kitchen windows waste heat and fog up. Replacement with insulated glass and a sealed installation fixes both.
A tall faucet or a new backsplash can run into a low sill. We can raise the sill, change the window size or choose a unit that fits the new layout.
Old windows painted shut or with broken locks and cranks are a common reason to replace. New units come with working hardware and easy cleaning.
Before
AfterA postwar Cape Cod in Villa Park, a typical kitchen for Villa Park. What we started with: stainless double sink. What bothered the owners most: a drafty window that was hard to open over the sink. After: a new larger double-hung window over the sink with clean white trim. The job covered measuring the opening, protecting the kitchen, plus flashing and waterproofing.
Before
AfterThis one is a postwar Cape Cod in Elmhurst. Before: stainless double sink. The reason for the call: fogged glass and peeling paint on the window over the sink. The result: a new larger double-hung window over the sink with clean white trim. On site this meant flashing and waterproofing, setting and insulating the window, plus interior trim and stool.
Kitchen Window Replacement in Elmhurst →
Before
AfterA postwar Cape Cod in Lombard, a typical kitchen for Lombard. Before: stainless double sink. The main complaint was an old window that let in cold air at the counter. After: a new larger double-hung window over the sink with clean white trim. On site this meant opening repair or reframing, flashing and waterproofing, plus setting and insulating the window.
Kitchen Window Replacement in Lombard →
Before
AfterA new layout with an island, cabinets in warm white shaker, light gray quartz counters and a flush drum fixture and under-cabinet lights.
Kitchen Design & Layout Planning in Villa Park →
Before
AfterA lowered black honed granite counter section with knee space under the sink, cabinets in deep burgundy with polished nickel pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and black cage pendants and slim recessed lights.
Accessible Kitchen Remodeling in Villa Park →ZIP 60181
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.