Condo deliveries and building rules
In a condo building we reserve the freight elevator, protect the halls and work within quiet hours.
Serving Lombard & nearby Villa Park, Glen Ellyn
New range, dishwasher, built-in fridge or microwave? We install kitchen appliances in Lombard and take the old ones away.
Our Lombard crews install dishwashers, gas and electric ranges, wall ovens, cooktops, built-in refrigerators and microwaves, whether you bought them from a big-box store, a local dealer or online. Each one goes in level, secured and checked before we leave.
In a condo building we reserve the freight elevator, protect the halls and work within quiet hours.
When an appliance installed by someone else starts leaking, we pull it, check each joint and put it back level and dry.
Dishwasher Installation →If your new fridge has an ice maker and there's no supply behind it, a line has to be run. We connect it with an accessible shutoff.
Built-In Refrigerator Installation →Anti-tip brackets are part of every range install we do, including ones we fix after someone else.
Oven, Range & Cooktop Installation →Gas lines, 240-volt circuits, water valves and vent paths are checked up front, so you know what's ready and what isn't.
A microwave drawer in an island or a trim-kit model in a wall cabinet both depend on an exact cutout. We fit and secure them.
Microwave Installation →Built-in and panel-ready fridges need precise openings, anti-tip anchoring and clear ventilation. We fit them flush with the cabinets.
Built-In Refrigerator Installation →If the store delivered the dishwasher without hooking it up, we connect water, drain and power and run a test cycle.
Dishwasher Installation →
Before
Installed
DetailA two-story colonial from the 1990s in Lombard, a typical kitchen for Lombard. Before: white appliances. The reason for the call: tired white appliances that needed replacing. Finished kitchen: a new range installed and level, anti-tip bracket in place. The job covered old appliance disconnected, electrical connections, plus testing.
Before
AfterA 1980s two-story in Villa Park, a typical kitchen for Villa Park. Before: almond appliances. The reason for the call: decades-old appliances that kept breaking down. Finished kitchen: a new range installed and level, anti-tip bracket in place. On site this meant old appliance disconnected, electrical connections, plus haul-away and cleanup.
Kitchen Appliance Installation in Villa Park →
Before
AfterA 1980s two-story in Glen Ellyn, a typical kitchen for Glen Ellyn. Before: black appliances. What bothered the owners most: new appliances waiting to be connected. The result: a new range installed and level, anti-tip bracket in place. Work included readiness check, cabinet and counter prep, plus haul-away and cleanup.
Kitchen Appliance Installation in Glen Ellyn →
Before
AfterCabinets in dark teal with brushed nickel bar pulls, charcoal concrete-look quartz counters, a white 2x8 tile in a vertical stack backsplash, hickory luxury vinyl plank flooring and recessed lights and under-cabinet LED strips.
Kitchen Remodeling in Lombard →
Before
AfterThe same doors sprayed in powder blue, new satin brass pulls; counters and floor stayed as they were.
Kitchen Cabinet Painting in Lombard →ZIP 60148
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Cabinet RefacingNew doors and fronts on your existing cabinet boxes.
Countertop Fabrication & InstallationQuartz, granite and butcher block, templated and installed.
Kitchen Backsplash InstallationTile backsplashes with clean lines and flush outlets.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.