Condo freight elevator and building rules
Getting a heavy fridge up to a condo means working within the building's rules. We schedule it and protect common areas.
Serving Lombard & nearby Villa Park, Glen Ellyn
We install built-in and panel-ready refrigerators in Lombard: cutout checked, anti-tip secured, water line connected and panels hung flush.
Built-in and panel-ready fridges are heavy, tall and unforgiving about their openings. Our Lombard installers measure before delivery, adjust the cabinetry where needed, anchor the unit per the installation guide and fit the custom fronts so the kitchen reads as one run of cabinets.
Getting a heavy fridge up to a condo means working within the building's rules. We schedule it and protect common areas.
Anti-tip hardware isn't optional on a heavy column or built-in fridge. We locate studs or add blocking and fasten it in.
Ventilation clearance comes from the installation guide. We make sure panels and cabinetry don't choke it.
If the fridge has an ice maker but there's no water behind it, a supply line has to be brought in from the sink or basement. We arrange it before install day.
A pair of column fridges and freezers must line up perfectly. We anchor each one and align the panels so they look like one piece.
If the unit won't make the turn into the kitchen, doors or trim may need to come off temporarily. We look at the route ahead of time.
We install undercounter refrigeration in islands and bars, connected and leveled under the counter.
Replacing a built-in rarely means the same box fits. We check height to the soffit or cabinet above, width between panels and depth to the wall first.
Before
Installed
DetailThis one is a two-story colonial from the 1990s in Lombard. What we started with: almond appliances and honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs. What bothered the owners most: an old refrigerator that stuck out past the cabinets. Finished kitchen: a panel-ready built-in refrigerator installed flush with the cabinetry. The job covered opening and cabinetry prepared, setting, leveling and anchoring, plus startup and haul-away.
Before
AfterThis one is a 1990s two-story colonial in Villa Park. The kitchen as it was: white appliances and white thermofoil cabinets peeling at the edges, oak trim. The main complaint was wanting the fridge to blend in with the cabinets. Finished kitchen: a panel-ready built-in refrigerator installed flush with the cabinetry. On site this meant old refrigerator removed, opening and cabinetry prepared, plus setting, leveling and anchoring.
Built-In Refrigerator Installation in Villa Park →
Before
AfterThis one is a 1980s two-story in Addison. The kitchen as it was: black appliances and golden-oak cabinets with oak soffits above. The main complaint was a bulky fridge sticking out past the counters. Finished kitchen: a panel-ready built-in refrigerator installed flush with the cabinetry. The job covered model specs and opening check, old refrigerator removed, plus trim, grille and ventilation.
Built-In Refrigerator Installation in Addison →
Before
AfterCabinets in dark teal with brushed nickel bar pulls, charcoal concrete-look quartz counters, a white 2x8 tile in a vertical stack backsplash, hickory luxury vinyl plank flooring and recessed lights and under-cabinet LED strips.
Kitchen Remodeling in Lombard →
Before
AfterFinished: the same doors sprayed in powder blue, new satin brass pulls; counters and floor stayed as they were.
Kitchen Cabinet Painting in Lombard →ZIP 60148
Dishwasher InstallationOld unit out, new dishwasher connected, leveled and leak-tested.
Oven, Range & Cooktop InstallationGas and electric ranges, wall ovens and cooktops, safely connected.
Microwave InstallationOver-the-range, drawer and built-in microwaves mounted, powered and vented.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.