Painted walls in a home built before 1978
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Serving Glendale Heights & nearby Bloomingdale, Carol Stream
Cracked plaster, bulky soffits and patched ceilings in Glendale Heights kitchens, finished smooth and ready for paint.
We handle the surfaces around the cabinets: walls, ceilings, soffits and trim. In Glendale Heights that can mean patching plaster in an older house, taking down a soffit before new cabinets go in, or matching a ceiling texture after a plumbing repair.
We treat old paint as possibly lead-based in older homes and contain the work area before we sand or demolish anything.
Dropped kitchen ceilings from the 1970s can usually be removed. We check what is above and patch the original ceiling.
Condo ceilings can include fire-rated assemblies. We repair them with the right board and follow building rules on work hours.
Old anchor holes, moved outlets and a gap where the hood used to be all need patching before paint. We fill them so they cannot be seen.
Crown molding at the ceiling, new casing around doorways and a clean baseboard finish a kitchen. We install and caulk trim ready for paint.
Tile removal, new wiring and cabinet swaps leave walls uneven. We skim coat or patch so the wall reads as one flat surface.
Steam and splashes break down drywall near the sink and range. We replace damaged areas with moisture-resistant board where it makes sense.
If what is inside cannot move, we rebuild a smaller, cleaner soffit or box it to line up with the cabinets.
Before
AfterA two-story colonial from the 1990s in Glendale Heights, a typical kitchen for Glendale Heights. The kitchen as it was: golden-oak cabinets with oak soffits above and two hanging glass pendants. The reason for the call: soffits that limited how tall the cabinets could be. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. Work included framing and backing, crown, casing and trim, plus cleanup.
Before
AfterThis one is a two-story colonial from the 1990s near Old Town Bloomingdale. The kitchen as it was: honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs and a fluorescent box light in the ceiling. The reason for the call: a dropped ceiling and an old light box. Finished kitchen: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered protection and dust control, taping and finishing, plus skim coat and texture.
Kitchen Drywall & Finish Work in Bloomingdale →
Before
AfterThis one is a 1990s two-story colonial in Carol Stream. The kitchen as it was: white thermofoil cabinets peeling at the edges, oak trim and a brass chandelier over the nook. The reason for the call: bulky soffits and a cracked ceiling. The result: soffits removed, ceiling and walls refinished smooth and painted, new crown molding. The job covered framing and backing, new drywall, plus taping and finishing.
Kitchen Drywall & Finish Work in Carol Stream →
Before
AfterWhat changed: a new layout with an island, cabinets in terracotta, charcoal concrete-look quartz counters and a flush drum fixture and under-cabinet lights.
Kitchen Design & Layout Planning in Glendale Heights →
Before
AfterFinished: a lowered charcoal concrete-look quartz counter section with knee space under the sink, cabinets in deep burgundy with brushed nickel bar pulls, pull-down shelves in the uppers, drawers instead of base doors, a side-opening wall oven, a lever faucet and a flush drum fixture and under-cabinet lights.
Accessible Kitchen Remodeling in Glendale Heights →ZIP 60139
Costs and budgetingKitchen Remodel Cost in Chicago: Budget Breakdown, Cost per Square Foot and LaborKitchen remodel cost is driven by scope more than size. National cost guides put a typical project between about $14,600 and $41,600, with an average…3 min read
Running the projectKitchen Remodel Timeline & Checklist: How Long Does a Kitchen Remodel Take?How long does a kitchen remodel take? For a same-layout kitchen, construction usually runs about four to eight weeks once cabinets and materials are…3 min read
Running the projectKitchen Remodel Permits: Do I Need a Permit to Remodel My Kitchen?Usually yes. Kitchen work that touches plumbing, electrical wiring, gas lines, ventilation or the structure almost always needs a permit and…3 min read
Kitchen Design & Layout PlanningLayouts, 3D plans and material picks before work starts.
Accessible Kitchen RemodelingKitchens that work for every age and ability.
Kitchen AdditionsBump-outs that add room for an island or dining area.
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.