Debris and dust on windows
Windows near a remodel get dusty glass, gritty tracks and paint specks. We clean the glass, sills and tracks.
Serving Bolingbrook & nearby Woodridge, Naperville
Construction dust, residue and debris cleared out of your new Bolingbrook kitchen so you can actually use it.
Construction dust is finer than household dust and settles back down for days after a broom stirs it up. Our crew in Bolingbrook removes it properly: HEPA vacuuming first, then wiping every surface, inside the new cabinets, along the trim and in the vent registers.
Windows near a remodel get dusty glass, gritty tracks and paint specks. We clean the glass, sills and tracks.
That white film on everything is gypsum dust from sanding. It takes several passes, starting at the top of the room, to get it off for good.
New appliances still need a cleaning before first use. We wipe out the interiors, racks and gaskets.
If you moved out for the remodel, we get the kitchen ready so you can unpack straight into clean cabinets.
Dust drawn into the registers and return grilles blows back out when the heat or air comes on. We vacuum and wipe the covers and the openings we can reach.
New boxes look clean until you run a finger along a shelf. We clean the inside of every cabinet and drawer, including the slides.
A cloudy film on fresh backsplash or floor tile is grout residue. We remove it with a cleaner suited to the tile once the grout has cured as directed.
Construction dust is abrasive. We lift it off instead of rubbing it in, so new finishes keep their shine.
Before
AfterThis one is a two-story colonial from the 1990s near Colonial Village. The main complaint was drywall dust on every surface after the remodel. Finished kitchen: the same new kitchen dust-free and ready to use: cabinets clean inside and out, counters and appliances free of labels and residue, floor cleaned. On site this meant walk-through after the trades finish, grout haze and spot cleanup, plus appliances, sink and windows.
Before
AfterA 1990s two-story colonial near The Meadows, a typical kitchen for Lisle. The reason for the call: construction dust in the cabinets and drawers. Finished kitchen: the same new kitchen dust-free and ready to use: cabinets clean inside and out, counters and appliances free of labels and residue, floor cleaned. On site this meant HEPA vacuuming top to bottom, vents, returns and fixtures, plus grout haze and spot cleanup.
Post-Renovation Cleaning in Lisle →
Before
AfterA 2000s two-story with an open kitchen in Plainfield, a typical kitchen for Plainfield. The main complaint was a new kitchen too dusty to use. After: the same new kitchen dust-free and ready to use: cabinets clean inside and out, counters and appliances free of labels and residue, floor cleaned. Work included debris pickup, inside cabinets and drawers, plus grout haze and spot cleanup.
Post-Renovation Cleaning in Plainfield →
Before
AfterCabinets in white uppers and deep green lowers with unlacquered brass knobs and cup pulls, warm walnut butcher block counters, a green zellige-look tile backsplash, warm oak luxury vinyl plank flooring and recessed lights and under-cabinet LED strips.
Kitchen Remodeling in Bolingbrook →
Before
AfterThe same doors sprayed in forest green, new satin brass pulls; counters and floor stayed as they were.
Kitchen Cabinet Painting in Bolingbrook →WestburyColonial VillageHeritage Creek
ZIP 60440ZIP 60490
Kitchen RemodelingFull kitchen remodels, from layout to last cabinet pull.
Kitchen Cabinet PaintingFactory-smooth painted cabinets without replacing them.
Cabinet RefacingNew doors and fronts on your existing cabinet boxes.
Countertop Fabrication & InstallationQuartz, granite and butcher block, templated and installed.
Kitchen Backsplash InstallationTile backsplashes with clean lines and flush outlets.
Call us — we'll check your ZIP, answer your questions and book an in-home estimate.