Serving Carol Stream & nearby Glendale Heights, Winfield

Kitchen Plumbing Relocation in Carol Stream, IL

Sinks, dishwashers and water lines moved to the new layout in Carol Stream, with the drain sloped and vented to code.

  • Serving Carol Stream ZIP 60188
  • Installed level, sealed and tested before we leave
  • Clear price for the install before the visit

Prefer a callback?

Leave your number and a Carol Stream licensed plumber will call you.

When the plumbing has to move in Carol Stream

Moving a kitchen sink is mostly about the drain: it needs slope, a vent and a path back to the stack. We plan that route first, then run new supply lines and get the work inspected before the walls and floor close up in your Carol Stream home.

House on a slab or crawlspace

In a ranch or split-level on a slab, moving the drain means cutting and trenching the concrete floor, then patching it. A crawlspace or basement makes the job far simpler.

Condo kitchen tied to a shared stack

In a multi-unit building the kitchen drain ties into a common stack. Short moves are often possible; long ones usually are not, and the association has to sign off.

Dishwasher on the wrong side of the sink

A dishwasher that sits in the way when its door is open can be moved. We run the drain hose and water line to the new bay and keep the connection under the sink tidy.

Sink stuck on the wrong wall

Many kitchens were built around one plumbing wall. Rerouting the drain and water lines frees the layout so the sink lands where it makes sense.

Not sure if the move is even possible

We check the drain route, the vent options and the floor structure first, so the design matches what the plumbing can actually do.

Old pipes found once the wall is open

Opening a wall to move the sink often exposes old galvanized supply or a corroded drain. We tell you what we find and replace the sections that should not stay.

New fridge spot with no water

Moving the refrigerator is easy; moving its water is plumbing. We bring a dedicated line to the new spot so nothing runs across the floor.

Island sink with no wall to vent into

Without a proper vent an island sink drains slowly and can siphon its trap dry, letting sewer gas into the kitchen. We plan the vent before the island is built.

What we hook up and check

  • Layout and route checkA visit to trace the stack, the vent and the path from the old sink to the new spot.
  • Permit applicationWe file for the village plumbing permit where the job calls for one.
  • Opening walls or floorWe cut the smallest openings that let us run pipe and work cleanly.
  • New drain at the right slopePVC or other code-approved drain pipe laid with a steady fall to the stack.
  • VentingA vent tied into the system, or a loop vent in an island, run to the plumbing code.
  • Pressure test and inspectionLines tested for leaks and left open for the village rough-in inspection.
  • Final hookupOnce the new counter is installed, the fixtures are connected and checked for leaks.

Options to choose from

Quarter-turn shut-off valvesBall-type stops under the sink and behind the fridge that close fully with a quarter turn.
Cleanouts at the new drainWe add a cleanout where the new drain joins the old line, so it can be serviced later.
PEX supply linesPEX bends around framing, which means fewer joints that could leak later.
Loop ventA vent loop inside the island cabinet that rises as high as possible before dropping to the drain.
Copper supply linesType L copper soldered or press-fitted, a long-lasting choice for supply lines.

Before and after: kitchens near Carol Stream

Kitchen Plumbing Relocation in a 1980s-1990s two-story colonial / tract house — beforeBefore
Kitchen Plumbing Relocation in a 1980s-1990s two-story colonial / tract house — afterAfter

Before and after: a 1990s two-story colonial in Carol Stream

This one is a 1990s two-story colonial in Carol Stream. The kitchen as it was: white cast-iron double sink and honey-oak cathedral raised-panel cabinets with worn finish near the handles, brass knobs. The reason for the call: no room to prep near the sink. The result: a new island with a prep sink, the drain, vent and water lines relocated from the old wall. On site this meant opening walls or floor, new drain at the right slope, plus venting.

Kitchen Plumbing Relocation project in Winfield, beforeBefore
Kitchen Plumbing Relocation project in Winfield, afterAfter

Before and after: a 1990s two-story colonial in Winfield

This one is a 1990s two-story colonial in Winfield. Before: solid-surface integrated sink and golden-oak cabinets with oak soffits above. The main complaint was a layout tied to one old plumbing wall. The result: a new island with a prep sink, the drain, vent and water lines relocated from the old wall. Work included opening walls or floor, new drain at the right slope, plus venting.

Kitchen Plumbing Relocation in Winfield →
Kitchen Remodeling project near Carol Stream, beforeBefore
Kitchen Remodeling project near Carol Stream, afterAfter

Kitchen Remodeling in a 1990s two-story colonial, Carol Stream

Cabinets in light butter yellow with satin brass pulls, warm walnut butcher block counters, a gray beveled subway tile backsplash, black-and-white checkerboard tile flooring and two glass pendants and recessed lights.

Kitchen Remodeling in Carol Stream →
Kitchen Cabinet Painting project near Carol Stream, beforeBefore
Kitchen Cabinet Painting project near Carol Stream, afterAfter

Carol Stream kitchen, two-story colonial from the 1990s: kitchen cabinet painting

Finished: the same doors sprayed in creamy white uppers and navy lowers, new matte black pulls; counters and floor stayed as they were.

Kitchen Cabinet Painting in Carol Stream →

From the old unit to the new one

  1. Plan the moveSite check of the stack, the floor and the walls before the design is final.
  2. Permit and rough-inPermit filed, walls or floor opened and new drain, vent and water lines run.
  3. Test and inspectPressure test, then the village inspector checks the rough plumbing.
  4. Close up and connectAfter cabinets and counters, we set the sink, the faucet and the appliance hookups.

Kitchen Plumbing Relocation questions from Carol Stream homeowners

Can you do the plumbing if another company does the cabinets?
Sure. We work around the cabinet and counter schedule so the pipes end up where the sink base needs them.
How long does a kitchen plumbing relocation take?
A simple move can be done in a day or two; slab cutting or long runs take longer.
What if my house is on a slab?
The concrete is cut along the new drain route, the pipe laid at the right slope and the trench filled and patched before flooring.
What affects the price of moving kitchen plumbing?
Basement versus slab, the length of the run and how many fixtures move drive the price. You get a line-item estimate after we see it.
Do you also move the gas line for the range?
If the range moves, the gas line moves too, as its own permitted job scheduled alongside ours.
Does Carol Stream require a licensed plumber for plumbing relocation?
Checklists ask for plumbing contractor's license and plumber's license unless the homeowner does the work. Our plumbing connections are made by licensed plumbers.
Can you do plumbing relocation in a Carol Stream condo?
Associations usually set rules for work hours, elevators, deliveries and insurance, and many require approval for plumbing, electrical or structural changes. We provide the certificate of insurance and follow the building's rules.
Carol Stream building permit for plumbing relocation: where do I apply?
Permits go through Community Development Department, Building Permits & Inspections, phone (630) 871-6230. When your scope needs one, we prepare the application and schedule the inspections.
Do I need a permit for plumbing relocation in Carol Stream?
It depends on the scope. Carol Stream's rule in short: Permit required for most remodeling; exempt only if no structural change and no alteration or relocation of plumbing, heating or electrical; fixture swaps without piping changes are exempt. We handle the permit when one is needed with Community Development Department, Building Permits & Inspections.
Do you work in my part of Carol Stream?
Yes. Our crews work across Carol Stream — ZIP 60188 — and nearby Glendale Heights, Winfield, Bloomingdale.

Working in Carol Stream

  • A lot of Carol Stream kitchens date from the 1980s. We know these layouts well and what is worth keeping.
  • Condo or townhome? We follow association rules on work hours and elevators and bring the insurance certificate your board asks for.
  • We know how Community Development Department, Building Permits & Inspections handles kitchen permits and pull them for you.

ZIP 60188

Kitchen Plumbing Relocation nearby

Planning a kitchen project in Carol Stream?

Call us — we'll check your ZIP, answer your questions and book an in-home estimate.

Call now (708) 400-7049
Call (708) 400-7049Callback